Success Stories

Here you can find a list of some success stories of our

most important partner “TBU Stubenvoll” in Austria.

Biomass test plant in Dürnrohr (Austria 2008)

  • Test plant for pyrolisis of straw
  • Generation of electric power and district heating
  • 5 MW

 

Biomass heating plant in Zurich / Aubrugg (Switzerland 2010)

  • Fluidised-bed combustion of wood chips
  • Generation of electric power and district heating
  • 40 MW

Fluidised-bed reactor for ABRG Arnoldstein (Austria 2010)

  • Fluidised-bed combustion of hard, fluid and pasty waste
  • Electric power and supply for the local steam network
  • 11MW

Biomass heating reactor Heiligenkreuz (Austria 2009)

  • Fluidised-bed combustion for biomass
  • Electric power and process steam
  • 40 MW

Fluidised-bed installation McStep (Switzerland / Monthey 2010)

  • Fluidised-bed combustion of sludge and solvent
  • Process steam for a industrial plant
  • 7 MW

Fluidised-bed installation Villas Energie GmbH (Austria 2008)

  • Fluidised-bed combustion of enterprise-internal production waste and sludge
  • Heat transfer into the thermal oil system
  • 5 MW

Waste combustion plant (Malta 2009)

  • Reconstruction of a combustion installation in a slaughterhouse
  • Combustion of hospital waste and other garbage
  • Cooling by refrigerating machine operated by heat
  • 5 MW

Wood power station Basel (Switzerland 2008)

  • Fluidised-bed combustion of wood chips
  • Electrical power and district heating
  • 30 MW

Biomass heating plant Altenstadt-Schongau (Germany 2005)

  • Reconstruction of a fluidised-bed installation
  • Electric power and district heat
  • 40,4 MW

Waste combustion plant MSZ 3 Moskau (Russia 2007)

  • Stoker-fired furnace of domestic waste
  • Electric power for the own use and district heat
  • 2 x 45 MW thermal

Biomass heating plant OIE Neubrücke (Germany 2003)

  • Fluidised-bed combustion for biomass and waste wood
  • Electric Power and district heat
  • 30 MW